Yılsan Yatırım Holding

Project

IDA GPP

Yerka Elektrik Üretim A.Ş. is operating a power plant using geothermal resources in Ayvacık, Çanakkale. The installed power of the power plant is planned to be 11.75 MW and its generation capacity is 70 million kWh.

There are no national parks, nature parks, nature protection parks, special environmental protection areas and protected areas within the 2 km of ​​the activity area. As a result of the studies performed with maximum sensitivity to the environment, the domestic, national, and also environmentalist geothermal power plant, which is important in reducing the external dependency of our country in the energy sector, is coming into operation by October 2020.

Services Provided

  • Final Payment Certificate Preparation

  • Dispute Management

  • Amicable Settlement procedures

  • Acquittance with the contractors – subcontractors

  • Final account approval
  •  

Project

ARI SU Elektrik

The Akbaş HPP project is at the downstream of the tandem Akkent-Çalkuyucak HPP along the Büyük Menderes River in Denizli’s Çal district. The project was completed and put into operation on 12.12.2013. 

Located close to the Akkent-Çalkuyucak HPP, the project was designed to have a weir, around 3-km tunnel, forebay pool and a penstock (65 m head 1.5 m diameter). The plant is capable of handling 19.6 m³ water per second. 

Project construction was undertaken by Kuzey İnşaat Makina A.Ş while electromechanical equipment was supplied by the ANDRITZ Hydro (France) & INDAR consortium. 

Proposed annual energy production capacity of the plant is 45.5 million kWh.

Services Provided

  • Dispute Management

  • Case Management

  • Statement Preparation for the Case Files

  • Technical Consultancy to the Legal Team

  • Attending to the Hearings

Project

DNZ Elektrik

The construction of the Akkent-Çalkuyucak HPP along the Büyük Menderes River in Denizli’sÇal district was completed, and the plant was put into operation on 22.11.2013.

The project was designed to have a weir, 4-km tunnel, forebay pool and a penstock (89 m head 1.5 m diameter). The plant is capable of handling 18 m³ water per second.

Project construction was undertaken by KuzeyİnşaatMakina A.Ş while electromechanical equipment was supplied by the ANDRITZ Hydro (France) & INDAR consortium.

Proposed annual energy production capacity of the plant is almost 40 million kWh.

Services Provided

  • Dispute Management

  • Case Management
    Statement preparation for the case files

  • Technical consultancy to the legal team

  • Attending the hearings